HomeNewsHighbridge grinds to a halt after traffic lights failure

Highbridge grinds to a halt after traffic lights failure

-

Traffic ground to a halt in Highbridge on Friday evening (February 6th) after the failure of a set of four-way temporary traffic lights.

Long queues of vehicles built up along Church Street and the A38 for several hours after the lights became stuck on red.

The lights are in place while three months of major roadworks are carried out in the town. Burnham-On-Sea.com was first reported the work earlier this year, which will see gas mains along Church Street being replaced. The work is being conducted until the end of April. Work was temporarily halted on Friday by the wintry weather.

TODAY'S MOST VIEWED NEWS

All Walls

TC Caravans

Haze Caravan Rentals

49 Esplanade

WEATHER

Burnham-on-Sea
overcast clouds
13 ° C
14.1 °
12.2 °
61 %
0.9kmh
100 %
Mon
14 °
Tue
13 °
Wed
14 °
Thu
12 °
Fri
17 °